Viaduct „Babina rijeka“
On the Klopce – Donja Gracanica subsection construction of the Babina Rijeka viaduct has been completed, which is one of the most demanding structures on
+ 387 (0)33 922 200
On the Klopce – Donja Gracanica subsection construction of the Babina Rijeka viaduct has been completed, which is one of the most demanding structures on
Client: PC Roads of FB&H Consultant: INOCSA Ingeniería, Madrid Designer (Subcontractor): TZI-Inzenjering Ltd. Sarajevo Services provided by TZI-Inzenjering Ltd. Sarajevo: Development of the Main designs
Major track overhaul and tunnel Ivan rehabilitation works, section Sarajevo – Bradina in the length of 33,60 km Client: Bosnia and Herzegovina Railway Public Corporation
Client: The Ministry of Transport and Communications of Sarajevo Canton and The Road Directorate of Sarajevo Canton Designer: TZI-Inzenjering Ltd. Sarajevo Services provided by TZI-Inzenjering
The section is situated from the old Orthodox church to the ‘S’ curve at Marijin dvor, in the length of 2,200.00 m. By applying modern
Client: The Ministry of Transport and Communications of Sarajevo Canton and The Road Directorate of Sarajevo Canton Designer: Consortium INOSCA Ingeniería, Madrid, TZI-Inzenjering Ltd. Sarajevo,
Professional – technical supervision of the subsection Medjugorje – Bijaca Consortium: TZI-Inzenjering Ltd. Sarajevo in cooperation with Roughton International Ltd. Subsection Medjugorje – Bijaca is
Responsible designer for development of Preliminary, Main and Detailed Design: TZI – Inzenjering Ltd. Sarajevo The construction of the new city pedestrian bridge Duga in
Client: PC Republic of Srpska MotorwaysDesigner: TZI – Inzenjering Ltd. Sarajevo Short description and services provided by TZI – Inzenjering Ltd. Sarajevo: By the implementation