TZI - Inženjering

Interchange Stup – Inter-Entity Boundary

Client: The Ministry of Transport and Communications of Sarajevo Canton and The Road Directorate of Sarajevo Canton

Designer: TZI-Inzenjering Ltd. Sarajevo

Services provided by TZI-Inzenjering Ltd. Sarajevo:

Development of Detailed design of the 12th Transversal from the Stup Interchange to the Entity border. The route of the 12th Transversal starts right in front of bridge over Miljacka river, and represents the continuation of LOT 2b of Sarajevo Bypass. The project of Stup Interchange, as a part of the 12th Transversal and currently the busiest and most frequently used road junction in the area of Sarajevo Canton and beyond, consists of the reconstruction of existing ramps B and D, and the construction of two new ramps A and C, thus the Stup Interchange takes a new shape (clover alike), with all required dynamic, traffic related and aesthetic elements.